|
Melbourne Cement Facilities (MCF / ACF)
- High Voltage electrical switching for the reclaim of the ship to shore.
- Maintenance and up keep of all electrical reticulation on site
- Installation of truck alignment system to all Weigh Bridges
- Installation of taffic signlas for Weigh Bridge safety.
When trucks have left the bridge, it allows another to proceed oto the Weigh Bridge
|
| |
|
|
Independent Cement And Lime (ICL) And Steel Cement
- Maintenance and up keep of all electrical reticulation on site.
|
| |
|
|
Nestlé’s, Altona
- Up Keep of all C-Bus lighting System.
- Safety assessments of all electrical equipment.
- Testing of lighting in and around warehouse.
|
| |
|
 |
Abtech Industrial, Fitzroy
- Citilink Lighting maintenance
- AXA Sign Maintenance
- Como Centre Channel 10 Sign
- Swinburne University Sign Maintenance
|
| |
|
|
GWC Group (joint venture with Georgio Winslow Construction)
- Sewer pipe upgrade to South East Water and Hallan 10km 1500mm pipe jack tunnel (Herrenknect). All powered by generators. Power consumption site 400A P/P. TBM 200A P/P over 2.5 years. Site established at each shaft for light and power. 24 hour operation and 24 hour call service.
|
| |
|