Major Ongoing Projects include... (click here to see our High Voltage Projects)

Melbourne Cement Facilities (MCF / ACF)

  • High Voltage electrical switching for the reclaim of the ship to shore.
  • Maintenance and up keep of all electrical reticulation on site
  • Installation of truck alignment system to all Weigh Bridges
  • Installation of taffic signlas for Weigh Bridge safety.
    When trucks have left the bridge, it allows another to proceed oto the Weigh Bridge
   
Independent Cement And Lime (ICL) And Steel Cement 
  • Maintenance and up keep of all electrical reticulation on site.
   

Nestlé’s, Altona

  • Up Keep of all C-Bus lighting System.
  • Safety assessments of all electrical equipment.
  • Testing of lighting in and around warehouse.
   

Abtech Industrial, Fitzroy

  • Citilink Lighting maintenance
  • AXA Sign Maintenance
  • Como Centre Channel 10 Sign
  • Swinburne University Sign Maintenance
   

GWC Group (joint venture with Georgio Winslow Construction)

  • Sewer pipe upgrade to South East Water and Hallan 10km 1500mm pipe jack tunnel (Herrenknect). All powered by generators. Power consumption site 400A P/P. TBM 200A P/P over 2.5 years. Site established at each shaft for light and power. 24 hour operation and 24 hour call service.
   